Impact
What two sites change.
Figures for both sites at 3 MW each.
- 95–100% renewable hydrogenTrue solar operation, not 'mostly renewable'. Grid dependency 0–5%.
- No lithium on siteSand and hydrogen carry storage; no battery supply chain, no end-of-life bank.
- Farm residue as feedstockWheat husk that would otherwise be burnt in the field becomes tableware.
- Rural industrial jobsTwo districts, two factories, skilled operations roles in hydrogen and manufacturing.
- Replicable25+ Indian locations meet the site criteria; 50–75 MW buildout potential by 2035.

