Energy flow

The inputs vary. The output does not.

Three sources hand over to each other across the day. The electrolyser never notices.

Energy supply over 24 hours against a flat electrolyser loadDirect solar rises from 06:00 and ends around 18:00. Under-panel fluid discharges from late afternoon into the evening, and the sand battery carries the load from evening until about 04:00. Throughout, the electrolyser load stays flat at rated output, dipping only in the two-hour margin before dawn.06:0012:0018:0000:0006:00Electrolyser load — flat for 22 hours2 h marginkW
Direct solarUnder-panel fluid dischargeSand battery dischargeElectrolyser loadShape is modelled, not measured

Reading the chart

From 06:00 the concentrators drive the electrolyser directly and, by mid-morning, produce more than it can use. The surplus charges the under-panel fluid first and the sand battery second.

Around 18:00 direct solar ends. The fluid store takes the load for four to six hours; the sand battery follows and carries it through to about 04:00. The two hours before sunrise are the margin — the only hours not covered by the previous day's sun, and the hours the fuel cell and, in Year 1, a 50 kW grid tie are sized to cover.

The shape is modelled at Punjab irradiance for a 1 MW electrolyser. The MVP's job is to replace this curve with a measured one.

22hours/daymodelled
19%capacity utilisationmodelled
4–6hours post-sunsetmodelled
6–8hours backupmodelled
500–600 °Cstorage temperaturesupplier spec
95%electrolyser uptimemodelled