Khordha district, Odisha · 20.18° N, 85.62° E
Odisha — Khordha
Bamboo salt, 20 → 90 tonnes/month. Hydrogen-fired nine-cycle roasting at 800–1000 °C, plus process heat for drying and crystallisation, on an 80 kW fuel cell, 24 hours six days a week.
- Land
- 10 acres; solar field, production zone and bamboo-salt roasting unit
- Water source
- Groundwater and treated municipal supply; lower TDS than coastal clusters
- Irradiance
- 5.2 kWh/m²/day · site data
- Industrial cluster within 100 km
- Bhubaneswar–Cuttack industrial belt; steel and metals within 100 km
- Captive manufacturing line
- Bamboo salt, 20 → 90 tonnes/month
- Fuel cell
- 80 kW · plan
Concept layout
Ten acres, same spine.
- 01Solar concentrator field sized for 1 MW electrolysis with thermal stores
- 02PEM electrolyser hall, 1 MW expandable to 3 MW
- 03Sand battery and under-panel fluid store
- 04Water treatment from groundwater and municipal supply
- 05Bamboo-salt roasting unit with hydrogen-fired kiln and 80 kW fuel cell
- 06H₂ compression, storage and dispatch yard
Plan-view render for Odisha is in preparation.
Mapped demand by sector
Mapped, not contracted.
Share of hydrogen demand within 100 km, by sector. Customer names are published with their permission.
- Steel & metals34%
- Food processing14%
- Fertiliser13%
- Refining12%
- Wellness hospitality10%
- E-mobility9%
- Pharmaceutical8%